S a v e M o n e y a n d I m p r o v e Y o u r P r i n t i n g
MIS Associates Inc 2901 Auburn Rd Auburn Hills, MI 48326 800-445-8296
http://www.inksupply.com Fax: 248-289-6013 Email: [email protected]
Next, clean and dry the printer housing with alcohol where the bridge bracket is to be
installed. Locate the Bridge Bracket from your package and install it as shown in the photo.
Before peeling the protective film from the double sided tape strips on the bridge bracket,
place it in the location described below and as seen in the photo below. The Bridge Bracket
mounts on the left side of the printer in such a way that the 90 degree tab on the bottom of
the Bridge Bracket is flush with the left lip of the printer and behind the tab on the printer
housing. This area should have been cleaned with an alcohol pad. Now peel the protective film
from the double sided tape strips on the bracket. See the photos below.
4.
The tubing ends with the white plugs should now be on the left hand side of the printer. You
can now place the tubing into the beige clips on the bridge brackets, using the marks on the
tubing, and close them.
The tubes should be positioned in the right Bridge Bracket clip first. The tubing should be
marked where it will be placed in the clip. This position should allow enough length of tubing so
that the cartridge carriage can slide the full length of the printer from right to left and back
again without pulling the tubes and without being restricted by the tubes when they are
placed in the clip on the Bridge Bracket, and the tubes do not drag on the bottom of the
printer. Checking this process will be a bit difficult as the cartridges should not yet be fully
locked into the carriage.
Location of velcro strips