background image

Basic Serial Functional Specification for LV-5210/7215/7210   

                                                                                   

                                       

 

 

7.3.2  

“80” 

[CR] 

Status: STAND BY 

When the status is STAND BY, Status Read Commands are always acceptable, but 

Functional Execution Commands are not acceptable except Power ON Command.

 

7.3.3 “40” 

[CR] 

Status: Processing Count Down 

When “Display” in Setting Menu is ON and Power ON is executed, it starts 

processing Count Down. Also, when “Display” OFF in the setting menu is set, 

processing Count Down is skipped and the status moves to Power ON quickly. 

 

7.3.4 “20” 

[CR] 

Status: Cooling 

When status is Power ON, and Power OFF Command is executed, it moves to 

cooling status. 

This cooling status automatically moves on to Stan By after the lamp turns off and 

the fan spin for about 90seconds. 

The time defers from models.  This Cooling Down Works for lamps and other 

optical accessories.    Control commands are not available for this status. 

7.3.5  

“10” 

[CR] 

Status: Abnormal power supply voltage 

When the power supply voltage inside the projector reaches abnormal power supply 

voltage, the power will be automatically turned off.    The projector returns “10”[CR] 

and cooling fan is also stopped at the time. 

7.3.6  

“28” 

[CR] 

Status:  Processing Cooling Down because of critical temperature. 

When the temperature inside a projector is out of the operating temperature, it 

automatically starts cooling down.  Response “28”[CR]. 

Even if the temperature is processing low, the cooling down is executed 

7.3.7 “08” 

[CR] 

Status:  Abnormal temperature 

When the temperature does not go down after cooling down due to the abnormal 

temperature, this is the Response.    The projector keeps the Standby status. 

7.3.8 “88” 

[CR] 

Status: Normal status after recovering abnormal temperature. 

When the temperature goes down after cooling down and moving to Standby 

status, this is the response. 

This status keeps until the next operation. In short, when Power On is   

executed, the temperature information is canceled, and works normal. 

 

 

 

  

 

Page 

20 

 

Summary of Contents for 7215 - LV XGA LCD Projector

Page 1: ...Basic Serial Functional Specification for LV 5210 7215 7210 LV 5210 7215 7210 BASIC SERIAL FUNCTIONAL SPECIFICATION Page 1...

Page 2: ...and 6 6 POWER OFF Command Quick POWER OFF 6 7 POWER OFF Command 6 8 Computer 1 Command 6 9 Computer 2 Command 6 10 Video Command 6 11 VOLUME Command 6 12 VOLUME Command 6 13 AUDIO MUTE ON Command 6 14...

Page 3: ...OINTER RIGHT COMMAND 6 43 POINTER LEFT COMMAND 6 44 POINTER UP COMMAND 6 45 POINTER DOWN Command 6 46 Mouse Right Click Command 6 47 ENTER SET COMMAND 6 48 FREEZE ON COMMAND 6 49 FREEZE OFF COMMAND 6...

Page 4: ...Basic Serial Functional Specification for LV 5210 7215 7210 7 6 Setting Command 7 7 Temp Read Command Page 4...

Page 5: ...ation 2 1 Transfer Specification Specification Shynchro system Asynchronous Transmission Speed 9600 19200 Data Length 8 bit Parity None Stop Bit 1 Flow Control None 1 Transfer rate initial setting val...

Page 6: ...jector has received the first data 3 3 When control command pipelining after the response wait interval of time 100ms as below More than 100 Command PC Projector C 0 7 CR Next command Projector PC ACK...

Page 7: ...R DOWN C0F REGULAR IMAGE 4 3 C3E Mouse right click C10 WIDE IMAGE 16 9 C3F ENTER SET C11 Image Standard C43 FREEZE ON C12 Image High contrast C44 FREEZE OFF C13 Image Cinema C50 Computer 1 Analog RGB...

Page 8: ...some functions need command pipelining the performance is the same as the remote control s performance 1 System issue any commands every 100ms after receiving response 2 When receiving the same comman...

Page 9: ...OWER OFF Other Commands POWER ON Note When the status is above even if the projector receives other command in the above status the projector returns ACK CR 6 5 POWER ON COMMAND COMMAND C00 CR Detail...

Page 10: ...itor Out the command will not be executed the response is Acceptable through Acceptable ACK CR Response Unacceptable CR 6 10 Video COMMAND COMMAND C07 CR Detail Select Video input Acceptable ACK CR Re...

Page 11: ...CR 6 15 VIDEO MUTE ON COMMAND COMMAND C0D CR Detail VIDEO MTUE ON This command works same as NO SHOW of the remote control but does not work for NO SHOW OFF Acceptable ACK CR Response Unacceptable CR...

Page 12: ...se Unacceptable CR 6 21 Image Cinema COMMAND COMMAND C13 CR Detail Set Image to Cinema Mode Acceptable ACK CR Response Unacceptable CR 6 22 Custom COMMAND COMMAND C14 CR Detail Set Image to Custom Mod...

Page 13: ...4 CR Detail Select Component input for Computer 2 However when Computer 2 terminal is set to Monitor Out acceptable command is returned but does not execute command Acceptable ACK CR Response Unaccept...

Page 14: ...ancel Power ON Start This status is stored in EEPROM even when power is OFF or ON Acceptable ACK CR Response Unacceptable CR 6 34 Power Management Ready COMMAND COMMAND C2A CR Detail Set Power Managem...

Page 15: ...control s ZOOM DOWN button Acceptable ACK CR Response Unacceptable CR 6 39 Video Auto COMMAND COMMAND C32 CR Detail Select Auto input for Video Acceptable ACK CR Response Unacceptable CR 6 40 Video Vi...

Page 16: ...ve Pointer to Down On Screen Display This command works the same as the remote control s DOWN button Acceptable ACK CR Response Unacceptable CR 6 46 Mouse Right Click Command COMMAND C3E CR Detail Thi...

Page 17: ...nse Unacceptable CR 6 51 INPUT 1 DVI PC Digital COMMAND COMMAND C52 CR Detail Select DVI PC Digital input for Input 1 Acceptable ACK CR Response Unacceptable CR 6 52 INPUT 1 DVI AV HDCP COMMAND COMMAN...

Page 18: ...able ACK CR Response Unacceptable CR 6 57 KEYSTONE UP COMMAND COMMAND C8E CR Detail Adjust keystone Make the screen image length at the top edge shorter Acceptable ACK CR Response Unacceptable CR 6 58...

Page 19: ...ut mode for the projector by basic commands Command current input mode command issue PC Projector C R 1 CR Projector PC 1 CR Response a few ms 1s Shows Computer 1 is selected 7 3 Status Read COMMAND C...

Page 20: ...for this status 7 3 5 10 CR Status Abnormal power supply voltage When the power supply voltage inside the projector reaches abnormal power supply voltage the power will be automatically turned off Th...

Page 21: ...SAVE Response 00 24 04 After 5 minutes with no signal after about 90 seconds 7 3 10 04 CR Status of Power Save The status is Power Save by the Power management function in setting menu 7 4 Input Mode...

Page 22: ...ptable 1 2 3 CR 1 2 3 1 Temperature sensor 1 2 Temperature sensor 2 3 Temperature sensor 3 Temperature data form shows as 00 0 When the temperature sinks to the first character is like 05 5 CR When ca...

Reviews: