![C&J DGT 5000 Owners Book Download Page 10](http://html1.mh-extra.com/html/candj/dgt-5000/dgt-5000_owners-book_3070019010.webp)
LT5032 (01:05-08)
10
C&J DGT 5000
Users Instructions
SECTION THREE
Fuel Bed Cleaning and Layout Cont.
•
Place a front row of 6 pebbles on to the front
of the granular bed as shown..
•
Place the final top row of 5 pebbles
bridging between the first low two rows.
DO NOT lay any further coals or pebbles
on top of the burner area of the fire
FUEL BED LAYOUT (EXTRA PEBBLE OPTION)
•
An extra pack of 17 pebbles can be
obtained to lay around the burner unit
grille as shown. Leave plenty of air
gaps between the pebbles to ensure
that the cooling air flow to the
underside of the burner is not impeded
in any way. DO NOT place these extra
pebbles on the combustion part of the
fire bed although they can bridge to the
front row of pebbles only.
The finished pebble arrangement should
look as shown.
Summary of Contents for DGT 5000
Page 22: ...LT5032 01 05 08 22 Blank Page...