1. M
a)
perfe
rotat
surfa
b)
and
i
facin
(N)
o
and
(
squa
Main
Pole
A
Verify
wit
ectly
level
and
tion
of
the
nu
ace
before
mo
Install
(4)
install
main
p
g
towards
pla
on
top
of
base
(4)
nuts
(J)
an
re
to
playing
ssembly
th
level
that
n
d
parallel
to
p
uts
may
be
req
ounting
the
m
metal
washe
pole
as
shown
aying
surface
e
plate
follow
nd
tighten.
M
g
surface.
CANAMHOOPS
™
nuts
on
ancho
playing
surfac
quired
to
pro
main
pole.
ers(N)
on
top
n
in
diagram
w
.
Place
(4)
m
wed
by
(4)
lock
Make
sure
tha
SYSTEM
or
system
are
ce.
A
slight
oduce
a
level
of
anchor
bo
with
(2)
gusse
etal
washers
k
washers
(U)
t
base
plate
i
10
ASSEMBL
lts
ets
)
is
LY
(PHASSE
3
‐
DAY
Y
5)
Version 2.0
CANAM HOOPS © all rights reserved.