Section 06 ELECTRICAL SYSTEM
Subsection 03 (STARTING SYSTEM)
PROCEDURES
STARTER SOLENOID
Solenoid Continuity Test
Remove the 20 A main fuse and the 20 A charging
system fuse for circuit isolation.
vmr2008-026-001_b
PF2 FUSE HOLDER
1. Main fuse
2. Spare fuse
3. Charging system fuse
Disconnect and remove the battery, refer to the
CHARGING SYSTEM
section.
Remove the solenoid mounting screw.
vmr2008-026-005_a
Disconnect the small terminal wires from the so-
lenoid.
vmr2008-026-007_a
1. Small solenoid coil wires
2. Small solenoid coil terminals
Set multimeter to
.
Measure solenoid coil resistance as follows.
CAUTION: Battery must remain disconnected
for the following continuity tests or multimeter
damage may occur.
vmr2008-026-008_a
SOLENOID COIL CONTINUITY TEST
MEASUREMENT
SOLENOID POSTS
RESISTANCE
@ 20°C (68°F)
SS1
SS2
Approx. 7
Test for a stuck solenoid plunger by measuring
the resistance across the solenoid contacts as fol-
lows.
248
vmr2008-026
Summary of Contents for DS 450 2008
Page 1: ...2008 Shop Manual DS 450 DS 450 X ...
Page 20: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 36: ......
Page 70: ......
Page 86: ......
Page 104: ......
Page 134: ......
Page 186: ......
Page 190: ......
Page 198: ......
Page 244: ......
Page 290: ......
Page 310: ......
Page 324: ......
Page 336: ......
Page 348: ......
Page 370: ......
Page 382: ......
Page 388: ......
Page 396: ......
Page 398: ......
Page 399: ...NOTES ...
Page 400: ...NOTES ...