36
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the lead
boiler will fire to the specified
base load rate (80%). If the
temperature is not within
Error threshold (5
o
F) of
setpoint after Interstage
delay (2 minutes) a lag boiler
will be brought online and
will also fire at the base load
rate specified.
•
Modulation of boilers will
only occur after all boilers in
the Lead Lag system are firing
at the specified base load
rate (80%).
1)
Place both toggle switches in
LOCAL
2)
Press
and select
Login
3)
Select
Advanced Setup
1)
Select
Lead Lag Config
2)
Select
Lead Lag Master Config
3)
Select
Base load common rate = 80.0%, and p
ress
Summary of Contents for DynaMax DMH201
Page 2: ......
Page 70: ...62 PART 14 EXPLODED VIEW PARTS LIST DYNAMAX HS WALL HUNG 10 May be located outside cabinet...
Page 71: ...63 DYNAMAX HS FLOOR MOUNT 10 May be located outside cabinet...
Page 77: ...69 11 6 Front Strut 14 8037 X X Not shown in Exploded View Part Recommended spare parts...
Page 78: ...70 PART 15 ELECTRICAL DIAGRAMS 15 1 DM 200 299 INTERNAL WIRING DIAGRAM...
Page 79: ...71 15 2 DM 399 800 INTERNAL WIRING DIAGRAM...
Page 80: ...72...