30
Slave Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Slave boiler lead lag setup
1)
Place both toggle switches in
LOCAL
2)
Press
and select Login
3)
Select Advanced Setup
4)
Select
System
5)
Select
System ID & Access
6)
Select
MB1 Modbus address = 2
. To be in sequential order
7)
Select
MB2 Modbus address = 2
. To be in sequential order
8)
Select
Lead Lag Config
9)
Select
Lead Lag Slave Config
10)
Select
Slave enable = Enabled via SOLA master,
and Press