FT-305 Wiltshire Fountain
Assembly Instructions
Step 8 - Position the medium pedestal (FT-305C) over the pump in the large bowl (FT-114G).
Step 9 - Feed the tubing connected to the pump through the top of the medium pedestal
(FT-305C).
Step 10 - Fit the loose end of the tubing assembly to the pipe protruding from the bottom of the
medium bowl (FT-305B).
Step 11 - Center the medium bowl (FT-305B) over the medium pedestal (FT-305C).
Step 12 - Fit the finial (FT-305A) into the medium bowl (FT-305B) by feeding the protruding
copper pipe from the bowl into the hole in the bottom of the finial.
Step 13 - Place the pump cover door (FT-114F) into the medium pedestal (FT-305C).
Step 14 - Fill the fountain with water.
FT-305C (52 lbs)
13"W x 14.25"H
FT-305B (65 lbs)
25"W x 8.25"H
FT-305A (37 lbs)
7.75"W x 16.5"H
FT-114F (3 lbs)
5.25"L x 2"W x 4"H