background image

FT-269 Monteros Fountain

 

Professional installation is recommended for this fountain! Assemble your fountain on a level surface using crushed stone, gravel, or cement pad as the base.

 

Revised April 19, 2017 

 

 

FT-269H (392 lbs) 

24”L x 24”W x 15”H 

 

P-711 (535 lbs) 

47”W x 26”H 

 

FT-269F (103 lbs) 

13.5”W x 18”H 

 

FT-269E (94 lbs) 

29”W x 9.5”H 

 

FT-269C (35 lbs) 

9.25”W x 14”H 

 

 

1.

 

Place the base (FT-269H) on a level surface capable of 
holding 1465 pounds in a 4 square foot area where the 
fountain will be assembled. 

a.

 

Be sure to check that each part is level and 

centered during the assembly of this fountain.

 

 

 
 

2.

 

Place the urn (P-711) over the base. 

3.

 

Assemble the pump kit 

a.

 

Fit the 3/4” clear tubing over the pump outlet. 

b.

 

Place the stopper around the pump cord 

approximately 8” from the pump. 

4.

 

Feed the pump cord all the way through the hole in the urn 
(P-711), through the base (FT-269H), and out of the 
opening in the bottom of the base. 

5.

 

FIRMLY press the stopper into the hole evenly. 

a.

 

Note: Using the handle of a screwdriver or hammer 

works best to press the stopper in place. 

 

6.

 

Place the large pedestal (FT-269F) over the pump. 

7.

 

Feed the tubing that is connected to the pump through the 
hole in the center of the large pedestal (FT-269F). 

 
 
 
 

8.

 

Position the medium bowl (FT-269E) over the large 
pedestal (FT-269F). 

9.

 

Using a hose clamp, secure the tubing that was fed through 
the large pedestal (FT-269F) to the pipe protruding from 
the bottom of the medium bowl (FT-269E). 

10.

 

Secure the 18” length of tubing to the pipe protruding from 
inside the medium bowl (FT-269E) with a hose clamp. 

 
 

 

11.

 

Place the small pedestal (FT-269C) in the center of the 
medium bowl (FT-269E). 

12.

 

Feed the 18” length of tubing connected to the inside of the 
medium bowl (FT-269E) through the hole in the center of 
the small pedestal (FT-269C).

 

 

 
 
 
 
 
 

 
 

 

FT-269B (40 lbs) 

20.25”W x 7”H 

 

FT-269A (22 lbs) 

5.5”W x 12.5”H 

 

FT-269D (3 lbs) 

5”L x 1.5”W x 5”H 

 

FT-269G (5 lbs) 

6.25”L x 1.5”W x 5.25”H 

 

FT-269I (15 lbs) 

7.75”L x 1.5”W x 7”H 

 
 
 
 

13.

 

Position the small bowl (FT-269B) over the small pedestal 
(FT-269C). 

14.

 

Using a hose clamp, secure the tubing that was fed through 
the small pedestal (FT-269C) to the pipe protruding from 
the bottom of the small bowl (FT-269B). 
 
 
 
 
 

15.

 

Place the finial (FT-269A) into the small bowl (FT-269B) 
by fitting the copper in the finial over the copper in the 
bowl. 
 
 
 
 
 
 

16.

 

Fit the small pump cover door (FT-269D) into the small 
pedestal (FT-269C). 
 
 
 
 
 
 
 

17.

 

Fit the medium pump cover door (FT-269G) into the 
medium pedestal (FT-269F). 

 

 

 
 

18.

 

Fit the base door (FT-269I) into the base (FT-269H). 

 

19.

 

 Fill the basin with water. 

Reviews: