background image

FT-193 Caterina Fountain in Basin 

Assembly Instructions

Step 18 -   Position the coping with the channel (FT-193H) about 6" from the basin (FGB-2030) on 

the side of the fountain where the pump cord is tocome out.

Step 19 -   Position the 5 remaining copings (FT-193H) in a circle about 6" from the basin.

Step 20 -   Carefully push each piece one at a time toward the basin and into the notch of the  

coping.

 

20a - Fit each piece to the coping next to it.

Step 21 -   Fill the basin with water.

FT-193H (228 lbs each) 

40.25"L x 9"W x 15.25"H

Reviews: