6.3
– PERIODIC MAINTENANCE SCHEDULE
The following maintenance operations have to be
carried out only in case of tool proper functioning. If the
task is very hard, the operations shall be carried out
more frequently.
Before
every
use
After a
working
day
After a
working
week
After
every oil
addition
in the
reservoir
If the
tool is
damage
d or
faulty
At the
end of
every
working
season
–storing
time
Complete tool
Check losses, cracks and
wear and tear
X
X
Check operating lever (5),
active safety device (6)
and inertial chain brake
(12) (only for the tool
version without connection
to an extension pole)
Check for proper
functioning
X
X
Inertial chain brake (12)
(only for the tool version
without connection to an
extension pole)
Check for proper
functioning
X
Check at an Authorised
Service Point
X
Oil reservoir (22)
Check losses, cracks and
wear and tear
X
X
X
X
Chain (15) lubrication
Check for proper
functioning
X
Chain (15)
Check damages, wear
and tear, sharpening
X
X
X
Check its tension
X
X
Check the depth adjusting
device
X
X
Bar (14)
Check the wear and tear
X
X
Chain locking pin (18)
Check damages and
wear and tear
X
X
Replace
X
All the screws and nuts
which can be reached
Check and, if necessary,
tighten
X
X