4
M6x14
M6
=
=
V122
Upper edge of door
30
÷
60 cm
=
=
Spring-bar
UNIT ASSEMBLY
PREARRANGEMENT OF TRANSMISSION GUIDE
- Fasten the bracket to the transmission guide’s front terminal with the nuts and bolts provided;
TRANSMISSION GUIDE FASTENING
- Fasten the transmission guide in the following manner:
a) for sectional doors, fasten the bracket directly to the wall over the spring-release coiling shaft using
adequate dowels and screws; if the distance between the coiling shaft and the gate’s upper ledge is
between 30 and 60 cm, apply the V122 arm (read the technical documentation provided with the
accessory);
Summary of Contents for VER KIT
Page 22: ...NOTES...
Page 23: ...NOTES...