p.
8
- M
anu
al
FA0
158
1-
EN
-
03
/2
02
1 - © C
AM
E Ö
ZA
K. - T
ra
ns
la
tio
n o
f t
he o
rig
in
al i
ns
tru
ct
io
ns - T
he c
on
te
nt
s o
f t
hi
s m
anu
al m
ay c
ha
ng
e, a
t a
ny t
ime
, a
nd wi
th
ou
t n
ot
ic
e.
SETTING UP THE BARRIER
⚠
Warning! Use hoisting equipment to transport and position the barrier. The mounting must be done by at least two people. During the
initial mounting and fastening, the barrier may be unstable and could tip over. Then be careful to no rest against it until it is completely
and securely fastened.
Fit the customized key into lock on the inspection hatch and turn it counterclockwise.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Summary of Contents for G6000T
Page 2: ...2 1...