Pa
g.
12
- M
an
ua
l c
od
e:
11
9G
V2
9
v
er
.
2.
0
0
9/
20
10 © C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. -
Th
e d
at
a a
nd i
nf
or
m
at
io
n r
ep
or
te
d i
n t
hi
s i
ns
ta
lla
tio
n m
an
ua
l a
re s
us
ce
pt
ib
le t
o c
ha
ng
e a
t a
ny t
im
e a
nd w
ith
ou
t o
bl
ig
at
io
n o
n C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. t
o n
ot
ify u
se
rs
.
- Prior to bar balancing, select a suitable spring depending on the situation at hand. See table below:
Bare bar* + shock-resistant profile
Bare bar* + shock-resistant profile and luminous cord
Bare bar* + rack
Bare bar* + luminous cord and rack
Bare bar* + shock-resistant profile and mobile barrier support
Bare bar* + shock-resistant profile, luminous cord and mobile barrier support
Bare bar* + rack and mobile barrier support
Bare bar* + luminous cord, rack and mobile barrier support
Passage clearance lamp (ft)
4.9
5.7
6.6
7.4
8.2
9
9.8
10.7
11.5 12
- Tighten the anti-shearing protection cover to the bar fitting with UNI6954 Ø3.9x19 screws.
5.7 Bar balancing
* By Bare bar we mean a bar complete with the transparent slot cover and end plug.
PASSAGE CLEARANCE LAMP (max. 12 ft)
SPRING TYPES
spring G02040 Ø
e
= 1.57 in
spring G04060 Ø
e
= 1.96 in
spring G06080 Ø
e
= 2.16 in
UNI6954 ø3,9x19
Summary of Contents for G4140ZU
Page 1: ...GARD4 SERIES INSTALLATION MANUAL G4140ZU G4140IZU AUTOMATION FOR STREET BARRIERS...
Page 29: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK...
Page 30: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK...
Page 31: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK...