p.
77
- M
an
u
al
c
od
e:
F
A
0
1
0
3
8
-E
N
FA
0
1
0
3
8
-E
N
v.
11
- 0
1/
2
0
18 - © C
am
e S
.p.
A
. - T
h
e m
an
u
al
's c
onte
nts m
ay b
e e
d
ite
d at a
ny ti
m
e w
ith
ou
t n
oti
ce
.
Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole.
Fit an iron cage into the foundation frame to reinforce the concrete.
Assemble the four anchoring brackets to the anchoring plate.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Summary of Contents for G2080EZ
Page 33: ...Automatic barriers GARD 8 series G2080EZ INSTALLATION AND OPERATION English FA01038 EN...
Page 65: ...Barri res automatiques s rie GARD 8 G2080EZ MANUEL D INSTALLATION Fran ais FA01038 FR...
Page 97: ...GARD 8 G2080EZ FA01038 RU...
Page 98: ...2 FA01038 RU 1 01 2018 CAME S p A Came S p 2 5 20 CE 1 8 1 5 EN 12453 EN12445 8...
Page 103: ...7 FA01038 RU 1 01 2018 CAME S p A 24 600...
Page 104: ...N M 8 FA01038 RU 1 01 2018 CAME S p A 90 M N...
Page 105: ...UNI5931 M8x20 UNI5931 M8x12 UNI5931 M8x20 UNI6954 2 9x13 9 FA01038 RU 1 01 2018 CAME S p A...
Page 107: ...11 FA01038 RU 1 01 2018 CAME S p A 45 UNI5739 M12x70 UNI5588 M12...
Page 114: ...18 FA01038 RU 1 01 2018 CAME S p A 89...
Page 122: ...Z L 3 8 26 FA01038 RU 1 01 2018 CAME S p A...