- Dig a pit to the side of the gate (see measurements from diagram).
Prepare the corrugated tubes you will need when making connections coming from the shunt pit.
N.B. the number of tubes depends on the type of system and the accessories you will hook up.
The following applications are only examples, as the space for installing the ratiomotor and accessories varies according
to obstructions. It is thus up to the system installer to select the most suitable solution.
Shunt pit
- Prepare a form box that is larger in size than the securing plate and insert it into the pit. The form box should jut 50mm above
ground level.
Insert an iron grid inside the from box to reinforce the concrete.
Prepare the securing plate, insert the bolts into the holes and lock them using the supplied nuts and washers. Extract the preformed
brackets using a screw driver or a set of pliers.
5.5 Securing the plate and installing the assembly
MM
MM
MM
MM
MM
- Position the plate on top of the grid. Careful! The tubes need to pass through the apposite holes.
To position the plate in relation to the rack please see the measurements on the diagram.
Fill the form box with cement and wait for at least 24 hours for it to solidify.
MM
MM
MM
H
Conduits for electric
cables