Disconnect all power before installing or servicing 

the heater. Failure to do so could result in personal 

injury and/or property damage. All maintenance 

and  installation  should  be  done  by  qualified 

personnel in compliance with local codes.

MAINTENANCE

Low megohm on heating elements with epoxy or 

hermetic  seals  cannot  be  serviced  in  the  field. 

Typical  resistance  values  when  sealed  are  1000 

megohm or greater.

26.0

 Check that all connections are tight.

27.0

 

If a thermostat is provided, verify that it is operating properly

by cycling it and verifying cutout.

28.0

 Perform an IR test prior to energization and verify that levels

are acceptable 500,000 ohms.

29.0

 For adequate operation, always maintain the circulation 

heater  with  the  minimum  design  flow  conditions  for  which  the 

heater was designed.

30.0

  Retorque  all  bolted  fitting  connections  and  all  electrical 

connections after 10 cycles.

31.0 

Always maintain a minimum of 2" (51 mm) of liquid above 

the heated portion of the element or element failure may result.

32.0

 Heaters stored for prolonged periods may absorb moisture. 

Using a 500VDC megger (insulation resistance tester) check the 

value of the insulation resistance to ground for each circuit. Initial 

readings of over 500,000 ohms to ground are normally acceptable. 

Should lower readings be observed, check factory for instructions.

33.0

 Periodically check electrical connections for tightness and 

check wire insulation for any damage and replace if necessary.

34.0 

Remove the immersion heater periodically to inspect for 

corrosion, sludge build-up and for scale removal. Discontinue use 

if the heater shows signs of damage.

Note, the orientation of the flange or pipe plug relative to the vessel 

before removal. Use a reference mark on the immersion heater 

and vessel or draw a quick sketch showing the conduit connection 

orientation, to ensure the proper orientation when re-installing.

35.0

 Periodically check for leaks and torque of all bolted 

connections.

Overtemperature devices in the heating bundles 

are  specifically  located  based  on  process  and 

heater design. Rotation of the bundles should be 

avoided without consulting the manufacturer.

36.0

 If a heater element is damaged (sheath rupture or electrical), 

user must consult factory for further advice.

37.0

  Heater  output  can  be  verified  by  loop  current  draw  or 

resistance check. If heater is not operating properly, user must 

verify resistance, IR resistance to check integrity of heater 

elements.

38.0

 All returning product to the factory must be totally clean and 

a copy of the MSDS of the process fluid/gas must accompany the 

product.

CCI Thermal Technologies Inc. warrants to the purchaser of each new product that any part thereof which proves to be defective in 

material or workmanship under normal use within 18 months of the date of shipment or 12 months from the date of start of operation 

(whichever occurs first) will be repaired or replaced without charge. Any such defect should be brought to the attention of the company’s

office from which the product was purchased, which is authorized to furnish or replacement within the terms of this warranty.

The Company will not be responsible for any expenses incurred in installation, removal from service, transportation cost, or damages of 

any type whatsoever, including incidental or consequential damages.

Since we cannot anticipate or control the condition under which our products may be used, we accept no responsibility for the safety and 

suitability of our products when used alone or in combination with other products. Tests for safety and suitability of the products should 

be done by the user.

This warranty will not apply if, in the judgement of the Company damage or failure has resulted from accident, alteration, misuse, abuse 

or operation on an incorrect power supply. The foregoing is in lieu of other warranties expressed or implied. CCI Thermal Technologies 

Inc. neither assumes no authorizes any person to assume for it any other obligation, during transportation, installation and operation or 

liability in connection with the said product.

Since the paint finish may be damaged in use, no warranty applies to such paint finish except for manufacturing defects which become 

apparent within 30 days from date of installation.

Heaters are not guaranteed against damage caused by corrosion.

MAINTENANCE

Summary of Contents for EXC

Page 1: ...exceed the temperature code rating Corrosion of the sheath could result in a ground fault which depending upon the fluid being heated could cause a fire or an explosion FIRE HAZARD If a thermostat is provided it is designed for temperature control service only Since the thermostat does not fail safe it should not be used for temperature limiting duty Wiring to this device is the users responsibili...

Page 2: ...htest possibility that the liquid level may fall below the elements a level control switch or overtemperature sensing device affixed to the uppermost heating element is required Check factory for recommendations 16 0 If the heater is installed in a pressurized system a safety relief valve must be used to prevent a hazardous pressure buildup 17 0 Heaters with explosion resistant terminal housings m...

Page 3: ...ter design Rotation of the bundles should be avoided without consulting the manufacturer 36 0 If a heater element is damaged sheath rupture or electrical user must consult factory for further advice 37 0 Heater output can be verified by loop current draw or resistance check If heater is not operating properly user must verify resistance IR resistance to check integrity of heater elements 38 0 All ...

Page 4: ...m the date of installation The Company neither assumes nor authorizes any person to assume for it any other obligation or liability in connection with the product s The Purchaser agrees that all warranty work required after the initial commissioning of the product will be provided only if the Company has been paid by the Purchaser in full accordance with the terms and conditions of the contract Th...

Page 5: ... de fluide ou de gaz ainsi que le transfert thermique avec un fluide externe 3 0 Là où un joint d étanchéité est requis l utilisateur doit s assurer que la surface du joint est propre et sèche avant d installer le chauffeeau DÉFENSE d isoler par dessus la bride la zone surélevée et le boîtier de terminaison du thermoplongeur 4 0 Les bornes doivent être protégées à tout moment de l humidité et des ...

Page 6: ...rectement serré c Un thermoplongeur pour les emplacements dangereux n est approuvé à l utilisation que si un dispositif homologué de contrôle du niveau du liquide et ou un dispositif homologué de haute limite de température sont employés pour mettre le thermoplongeur hors tension au cas où le niveau du liquide baisserait 18 0 Le montage du chauffe eau doit être effectué conformément aux spécificat...

Page 7: ...rmétiques ne peut pas être résolu sur place Les valeurs normales de la résistance en présence de sceaux sont de 1000 MW ou plus 26 0 Vérifiez que tous les branchements sont serrés 27 0 Si un thermostat est fourni vérifiez qu il fonctionne correctement en le faisant passer par son cycle et en vérifiant la coupure du circuit 28 0 Effectuez un test IR avant la mise sous tension Vérifiez que les nivea...

Page 8: ...faut d alignement des pièces Aucune garantie ne s applique à la finition de peinture excepté dans le cas de défauts de fabrication apparen ts dans les 30 jours à compter de la date d installation La Société n assume ni n autorise aucune personne à assumer en son nom toute autre obligation ou responsabilité en rapport avec le les produit s L Acheteur accepte que tout travail relatif à la garantie e...

Reviews: