background image

2

A. 

INITIAL INSPECTION

1. 

Upon receipt from the carrier, inspect the heater for 
possible damage in transit. If necessary, immediately 
report damage to shipping company.

2. 

Verify that the nameplate voltage, phase, and wattage 
are as ordered and are suitable for use on the electrical 

power supply available. DO NOT CONNECT THE BX 
CONVECTION HEATER TO AN ELECTRICAL SUPPLY 

VOLTAGE OTHER THAN THAT SHOWN ON THE 

PRODUCT NAMEPLATE. 

3. 

The BX convection heater is CSA approved for operation 

in non-hazardous areas only. Ensure that no hazardous 

conditions exist before energizing the heater.

TABLE OF CONTENTS

A.  Initial Inspection 

2

B. Installation 

3

C.  Electrical Connections 

4

D.  Temperature Control 

5

E. Maintenance 

5

F.  Replacement Parts 

6

G. Elements 

6

Summary of Contents for BX2011S

Page 1: ...ts ISO 9001 WARNING WARNING The BX convection heater is a heavy duty baseboard designed for use in industrial environments and is not intended for use in residential and commercial locations The heater is not thermally protected and air flow obstruction with flammable materials could create a fire hazard All openings must be clear at all times ...

Page 2: ...lectrical power supply available DO NOT CONNECT THE BX CONVECTION HEATER TO AN ELECTRICAL SUPPLY VOLTAGE OTHER THAN THAT SHOWN ON THE PRODUCT NAMEPLATE 3 The BX convection heater is CSA approved for operation in non hazardous areas only Ensure that no hazardous conditions exist before energizing the heater TABLE OF CONTENTS A Initial Inspection 2 B Installation 3 C Electrical Connections 4 D Tempe...

Page 3: ...ounting details 4 1 Remove the two screws located on the front panel 4 2 Remove the heater front panel 4 3 Back off the screws on the universal mounting legs enough to allow penetration of the screw heads through the keyhole openings in the back of the heater 4 4 Slide the heater assembly to the side so that the mounting screws engage the keyhole openings 4 5 Tighten the mounting screws to secure ...

Page 4: ...ination 1 2 3 4 knockouts are provided for easy connection 4 The BX convection heater is completely prewired internally Connect the power conductors and control conductors to the terminations as illustrated on the wiring diagram enclosed 5 The schematic wiring diagrams shown below illustrate the BX convection heater with various control options Some of this equipment is optional and may not be inc...

Page 5: ...nd wiring of the selected thermostat must comply with the manufacturer s instructions CCI Thermal Technologies Inc can supply appropriate thermostats E MAINTENANCE WARNING WARNING The BX convection heater is constructed to operate in tough industrial applications with minimum maintenance However some routine maintenance is recommended to extend the life of the heater and its components ALWAYS DISC...

Page 6: ...refix Heater Element V Phase BX2011S 120 1 IXS11132 10 BX2021S BX2023S 208 1 3 IXS11132 13 BX2031S BX2033S 240 1 3 IXS11132 14 BX2071S 480 1 IXS11132 11 BX2073S 480 3 IXS11132 15 BX2081S 600 1 IXS11132 12 BX2083S 600 3 IXS11132 16 BX2011 120 1 IXS11132 01 BX2021 BX3021 BX2023 BX3023 208 1 3 IXS11132 02 BX2031 BX3031 BX2033 BX3033 240 IXS11132 03 BX2071 BX3071 BX2073 BX3073 480 IXS11132 07 BX2081 B...

Page 7: ...NOTES ...

Page 8: ...not so as to limit the generality of the foregoing includes physical chemical or mechanical abuse accident improper installation of the product improper storage and handling of the product improper application or the misalignment of parts No warranty applies to paint finishes except for manufacturing defects apparent within 30 days from the date of installation The Company neither assumes nor auth...

Reviews: