background image

 

15 

Press this button again to resume.   

LIGHT:

 

Switch for the external light. The button can be used as the switch for the external light 

as long as the system is connected to power supply. The LED is on when the light is turned on.   

   

Increase the temperature or time. 

   

Decrease the temperature or time.   

3.

 

AUTO FUNCTIONS 

Auto filling: 

inlet valve opens once the system is started and fills in water automatically until the 

water level reaches maximum level.    If water level is still lower than the minimum water level 10 
minutes  after,  it  indicates  faults  of  the  water  supply  system,  so  all  heating  elements  will  stop 
working and LCD will display “

-

E

”. 

Auto heating up by sections:

 generator will compare the measured room temperature with the 

setting temperature and then decides the number of working heating elements.   

Auto water supplementing: 

if the water level is lower than the desired level when operating, 

auto water supplementing function will be on and open the inlet valve. Once the water level reaches 
the  desired  level,  auto  water  supplementing  function  turns  off.  If  water  level  is  lower  than  the 
desired level 3 minute after the water supplementing order is given, it indicates faults of the water 
supply system, so all heating elements stop working and LCD displays “

-

E

”. 

Auto  drainage:

  when  setting  time  is  over  or 

ON/OFF

  button  is  pressed,  system  will  drain 

automatically  and  displays  „

-

d

”  on  the  LCD.  The  drainage  valve  and  the  drainage  pump  will  be 

turned on to drain. After a while the system will open the inlet valve to fill in water in order to wash 
and cool down the inner tank and heating elements. The whole process is about 3 minutes, and the 
system will be shut off automatically after drainage.   
 

CHAPTER 4    MAINTENANCE 

   

1.

    As leakage of the steam will damage the equipment.    To prevent any hazard, steam generators, 

steam jet, parts and pipe line connections should be checked regularly. 

2. 

  Clean  the  electromagnetic  valve,  magnetizer  and  all  the  other  sets  in  the  pipe  line  regularly 

according to the local water quality and usage of the steam generator.   

3.   

When  operate,  check  the  equipment  to  see  whether  it‟s  over  heated,  check  the  stability  and 

corrosion of all the wire plugs. 

4.    Replace the heating elements:

 switch off the steam generator and remove the element access 

cover when the generator completely cools down. Label the wires connect to the heating elements 
which need to be replaced and plug out the wires. Screw the heating elements out. Clear the scale in 
the  water  tank  and  screw  in  the  heating  elements  after  putting  the  rubber  rings  on  them  (airproof 
gasket  should  be  pressed  firmly  without  reversion).  Plug  on  the  wires,  make  sure  the  heating 
elements are properly connected before put on the element access cover. 

5.

 

Replace the main board:

 switch off the steam generator and remove the service cover when the 

Summary of Contents for NTC-60

Page 1: ...Calor de Hogar Av Tecnol gico 735 PB San Salvador Tizatlalli Metepec 52172 Edo de M xico Tel fono 722 216 3330 55 1163 6038 www calordehogar com servicio calordehogar om c ventas calordehogar com...

Page 2: ...Content 1 Introduction 2 Chapter 1 Parameters 3 Chapter 2 Installation and Cautions 5 Chapter 3 Functions and Operation 12 Chapter 4 Maintenance 14 Chapter 5 Troubleshooting 15 Chapter 6 Warranty and...

Page 3: ...ual for further reference ATTENION This appliance is not intended for use by person with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given...

Page 4: ...120 12 0 6 2 0 240 50 Table 1 Figure 1 1 Frame 2 Service panel for water level sensor 3 Auto drain motor 4 Drainage valve 5 Connector 6 T pipe 7 inlet magnetic valve 8 Side cover 9 Drainage pipe 10 Pi...

Page 5: ...ontrol Panel 12 Water Tank 13 Safety Valve MAIN PCB CONTROLLER POWER SUPPLY 13 Figure 2 2 Controller parameters and dimension Model Controller model Controlling time range minutes Temperature display...

Page 6: ...tallation No block valve should be installed in the steam pipelines Strictly no blocked or blended pipe otherwise have negative affect on the flow of steam and condensate The steam pipelines should be...

Page 7: ...4 i Install the generator on the wall drill two small holes on the wall insert the expansion screws and then hang the generator on those screws ii Install the generator on the ground or deck Install...

Page 8: ...L WIRE CONTROLLER WALL CONDUIT SENSOR WIRE CONNECTOR 2P CONTROL WIRE CONNECTOR 6P SEALING GLUE Figure 4 Figure 5 TEMP SENSOR IMMOBILIZING PLATE IMMOBILIZING SCREW WALL SENSOR WIRE Figure 6 4 Installat...

Page 9: ...pe is required to drain water to the drainage All inlet water pipes and steam pipelines should be built according to the National Standard refer to Figure 7 and this should be done before sealing the...

Page 10: ...and repair After the installation of the pipeline and electrical circuits careful checking must be performed before switch on the generator The generator has been carefully installed checked and test...

Page 11: ...60Hz power supply connect one of the live wires to the terminal labeled as L1 connect the other live wire to the terminal labeled as L2 and connect the ground wire to the terminal labeled as 240VAC60...

Page 12: ...L TEMP SWITCH HEATING ELEMENTS CONTROLLER WATER LEVEL SENSOR K3 K1 K4 CON1 K2 ZQJ FB4 PCB GND V12 K2 K4 K6 K1 K5 K3 L1 240VAC60Hz L2 No 100615 GND K3 K5 K1 K6 K4 K2 GND LOW Water level Probe DRAIN HIG...

Page 13: ...K1 K3 K5 K6 K3 K2 K1 K6 K5 CON1 K4 J1 1 K4 K1 J3 J7 LAMP J6 D VALVE J5 IN VALVE ON SW2 ON SW1 J1 TEST D1 D2 D3 D4 P2 P1 P3 D5 D6 J2 BT1 K3 JUMP N L POWER IN 45min DR ZQJ0806 GND HIGH DRAIN Water leve...

Page 14: ...remaining working time is within range of 40 50 minutes all LEDs are on when the remaining working time is within range of 50 60 minutes The default working time is 45 minutes If the system is in lon...

Page 15: ...temperature and time setting otherwise if the system is shut off automatically when setting time is up system will adapt the previous temperature and time setting Then system begins to heat up and pro...

Page 16: ...r ON OFF button is pressed system will drain automatically and displays d on the LCD The drainage valve and the drainage pump will be turned on to drain After a while the system will open the inlet va...

Page 17: ...blue wire and the two white wires respectively Take off all the wires screw out the water level sensor and screw in the new water level sensor until the bottom of the plastic nut reaches the same hei...

Page 18: ...magnetic valve 4 If the system keeps on heating up even if the current temperature is more than 4 above the setting value with the indicator on carefully test the relays on the sub board and change th...

Page 19: ...d altered damaged is not covered either Using in a salty environment or any other extreme corrosive condition is not covered by the warranty After the free warranty period services are still available...

Page 20: ...Calor de Hogar Av Tecnol gico 735 PB San Salvador Tizatlalli Metepec 52172 Edo de M xico Tel fono 722 216 3330 55 1163 6038 www calordehogar com servicio calordehogar om c ventas calordehogar com...