ELECTRICAL CONNECTIONS
Kudos6 Dual-flow boilers require fixed wiring to the rear terminal block.
A means of disconnection must be provided in which at least 3mm
seperation between the live and neutral poles of the supply exists.
Kudos9 Dual-flow boilers require fixed wiring to a 3 phase 4 wire supply in
which at least 3mm seperation exists in the three phases of the supply (but
not the neutral).
The installation of a residual current device (RCD) having a rated residual
operating current not exceeding 30 mA is advisable.
USER INSTRUCTIONS
During normal operation some external parts will become
very hot, particularly the tap body. Care must be taken to
avoid injury, a burn or scald.
Commissioning
Turn on the water supply and then switch on the electrical supply.
The Wait/Ready light will flash yellow and the unit will pulse with water
(8L/Min). When water reaches the normal operating level sensor, the
solenoid will be disabled and the element will be energised. When a
band of water around the draw off tap has reached the normal operating
temperature, the Wait/Ready light will show solid yellow colour (indicating
water available). The elements will remain energised until the full capacity
has reached normal operating temperature, indicated by the wait/ready
light turning to solid a orange colour.
Subsequent Use
After the boiler has finished the commissioning cycle and water is drawn
from the tap, water will be replaced in pulses automatically by the solenoid
the overfill pipe being extended as advised, any subsequent damage
incurred will be the responsibility of the installer.