Page 2
Page 3
CONTENTS
INTRODUCTION
Thank you for purchasing a Calomax Cascade-6A boiler. All our
products are designed to give years of simple, reliable operation.
To ensure this, it is important that the installation and subsequent
servicing is carried out by a suitably quali ed engineer in
accordance with these instructions.
For assistance in nding a suitable engineer in your area, visit our
web site www.calomax.co.uk or contact our service department on
0113 249 6681 or e-mail: [email protected]
INTRODUCTION
PAGE 3
CHECK LIST
3
APPROVALS
3
CONSTRUCTION
4
INSTALLATION
4
LOCATION
4
COLD WATER INLET
5
DIMENSIONS AND WEIGHTS
5
VENT / OVERFLOW
6
ELECTRICAL CONNECTIONS
6
USER INSTRUCTIONS
6
SCALE
7
GENERAL OPERATION
8
GENERAL NOTES
8
CLEANING
8
SPARE PARTS
9/10
EXPLODED DIAGRAM
12/13
SERVICE INSTRUCTIONS
11
ACCESSORIES
16/17
WIRING DIAGRAM
18
TROUBLE SHOOTING
19
WARRANTY
20
PRODUCT SPECIFICATION
24
CHECK LIST
Before commencing installation, check that the following parts have
been supplied with the boiler:
1. WRAS approved food grade water inlet hose
2. Status label
3. Free-standing drip tray
This product conforms to the CE marking directive 93/68/
EEC through compliance with the following standards:
Electromagnetic Compatibility Directive
Low Voltage Directive 73/23/EEC in accordance with:
BS EN 60335-2-75:2004
Compliance with these standards has been con rmed through
testing by an independent NAMAS approved body
Calomax products have been tested and found to
comply with the requirements of the Water Supply (Water
Fittings) Regulations 1999 for England and Wales Water
Bylaws 2000, Scotland and the Water Regulations
Ireland.
APPROVALS