background image

Page 4

Page 5

LOCATION

To comply with recommendations
from the health and safety executive
it is important that due consideration
be given to safe operation of the
controls of the boiler. The boiler should
therefore be mounted in such a manner
that the operator can stand directly
facing the machine with the controls at
a recommended height from the oor
to the draw-off tap handle of 1200mm
+/- 100mm. Consideration should also
be given to the servicing requirements
of the machine. The maximum and

COLD WATER INLET

minimum ambient operating conditions are 35 °C and 5 °C
respectively. The appliance is not suitable for installation where
a water jet could be used. Install the boiler in a position having
adequate ventilation, on a level and rm surface suitable for
near boiling temperatures and the working weight of the boiler.
Allow clearance for the easy removal of the outer casing lid and
rear panel. A suitably quali ed engineer must install this unit.
Plumbing and electrical installation work is involved.

To comply with the U.K. Water Supply Regulation a single check-
valve must be tted to the supply. BEFORE CONNECTING, THE
SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO
ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR
ENTER THE SOLENOID VALVE

The boiler must be connected to a potable water supply using
the food grade hose provided, in a manner which complies with
UK water regulations. The hose should be connected to a ½”
(15mm) drinking water supply via an appropriate isolating valve.
The supply must provide a constant pressure of between 20 KPa
and 1000 KPa (0.2 to 10 Bar), via an isolating stop cock tted
near the boiler

.

If the water supply contains excessive solids in suspension it is
recommended that a ne mesh “in line” water lter is tted in the
pipe work after the stop cock. Failures due to scale and sediment
are not covered by the warranty.

INSTALLATION

All metallic components of the machine, in direct contact with
drinking water are manufactured from high quality 304 grade
stainless steel, or non ferrous materials, providing maximum
resistance to corrosion.

CONSTRUCTION

The boiler must be installed in a location where access is
restricted to operators that are suitably trained, or where
untrained operators of the machine can be supervised by trained
personnel.

DIMENSIONS AND WEIGHTS

MODEL

A

B

C

D

DRY

WEIGHT

WORKING

WEIGHT

Cascade-

6A

mm 640

365

385

270

16.5 KG

56.5 KG

B

C

A

D

WATER INLET

VENT AND
OVERFLOW

45

Summary of Contents for Cascade-6A

Page 1: ...Manuals and Documents Brought to you by Wechillit com Ltd WCI Group House 18 Pride Hill Shrewsbury SY1 1DQ Tel 01743 289418 Fax 01743 289416 Web www wechillit com...

Page 2: ...ND SERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 E mail service calomax co uk www calomax co uk Please read these instructions carefully before...

Page 3: ...ENERAL NOTES 8 CLEANING 8 SPARE PARTS 9 10 EXPLODED DIAGRAM 12 13 SERVICE INSTRUCTIONS 11 ACCESSORIES 16 17 WIRING DIAGRAM 18 TROUBLE SHOOTING 19 WARRANTY 20 PRODUCT SPECIFICATION 24 CHECK LIST Before...

Page 4: ...CONNECTING THE SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR ENTER THE SOLENOID VALVE The boiler must be connected to a potable water supply using the food...

Page 5: ...oning cycle and water is drawn from the tap water will be replaced in short cycles small amount of water and then heat The solenoid and elements will never be on at the same time unless the boiler is...

Page 6: ...oklet All de scaling and servicing must be performed by a suitably quali ed engineer GENERAL NOTES GENERAL OPERATION Avoid using any abrasive materials Wiping the outer casing with a damp cloth should...

Page 7: ...or the machine has over lled due to debris trapped in the solenoid valve The debris can be removed by drawing plenty of water from the dispense tap causing the solenoid valve to operate and ush out th...

Page 8: ...uired are not identified please contact Calomax Limited Includes nuts washers etc Exploded parts view To be read in conjunction with the spare parts list Wrapper not shown for clarity 1 2 3 4 5 6 9 10...

Page 9: ...r should be switched off allowed to cool completely and the level sensors cleaned thoroughly as stated above before replacing elements and switching the boiler back on If in doubt protect the elements...

Page 10: ...3 3 bay as shown Shelf unit Ref SHU IC4 4 bay Boiler Stand To increase height of boiler Ref CAS6S Where denotes additional clearance between worktop and tap nozzle NB Not to scale For more information...

Page 11: ...solenoid lter and work the boiler or replace the solenoid see Service Instructions De scale replace sensors Replace P C B BASIC TROUBLE SHOOTING PINK BROWN ORANGE WHITE BLACK 0 75 RED 0 75 BLACK 1 5...

Page 12: ...are beyond our control and would invalidate the warranty offered These include Incorrect installation High Low water pressure Incorrect voltage supply Accidental damage Limescale build up The last it...

Page 13: ...Page 22 Page 23 SERVICE HISTORY AND NOTES SERVICE HISTORY AND NOTES...

Page 14: ...erage ow rate from tap During 18 litre Draw off 2 8 Litres Minute Voltage 220 240 V ac 50 60 Hz Power rating 6kW max single phase PLEASE ENTER SERIAL NUMBER FOR FUTURE REFERENCE Note All measurements...

Reviews: