P/N 96654, Rev. 0
Page 15
3
SETUP
IN THIS CHAPTER:
3.1 R
ECEIPT
AND
INSPECTION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -15
3.2 L
IFTING
AND
RIGGING
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -15
3.3 S
ECURING
THE
TEST
STAND
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -15
3.3.1 C
EMENT
IN
PLACE
(
OPTION
1 –
RECOMMENDED
) - - - - - - - - - - - - - - - - - - - - - - - - -16
3.3.2 D
RILL
AND
ANCHOR
(
OPTION
2) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -16
3.4 I
NSTALLING
UTILITIES
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -17
3.4.1 C
ONNECTING
WATER
FROM
THE
SOURCE
- - - - - - - - - - - - - - - - - - - - - - - - - - - -17
3.4.2 H
IGH
-
PRESSURE
SOURCES
FOR
TESTING
- - - - - - - - - - - - - - - - - - - - - - - - - - - -17
3.4.3 C
ONNECTING
TO
PILOT
VALVES
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -17
3.4.4 C
ONNECTING
TO
DRAIN
PORT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -18
This section describes the setup and assembly procedures for the Pilot Valve Tester
Pilot ValveTester.
3.1
R
ECEIPT
AND
INSPECTION
Your CLIMAX product was inspected and tested prior to shipment, and packaged
for normal shipment conditions. CLIMAX does not guarantee the condition of
your machine upon delivery.
When you receive your CLIMAX product, perform the following receipt checks:
1. Inspect the shipping containers for damage.
2. Check the contents of the shipping containers against the included invoice
to make sure that all components have been shipped.
3. Inspect all components for damage.
Contact CLIMAX immediately to report damaged or missing components.
NOTICE
Keep the shipping container and all packing materials for future storage
and shipping of the machine.
3.2
L
IFTING
AND
RIGGING
When lifting the console, lift from the bottom skids with a forklift.
3.3 S
ECURING
THE
TEST
STAND
The Pilot ValveTester must be anchor-bolted to the floor before operation.
Summary of Contents for 21001119
Page 2: ......
Page 4: ...Page B Pilot Valve Tester Operating Manual CLIMAX GLOBAL LOCATIONS ...
Page 5: ...P N 96654 Rev 0 Page C CE DOCUMENTATION ...
Page 6: ...Page D Pilot Valve Tester Operating Manual ...
Page 8: ...Page F Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 12: ...Page iv Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 14: ...Page vi Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 22: ...Page 8 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 28: ...Page 14 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 38: ...Page 24 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 40: ...Page 26 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 52: ...Page 38 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 54: ...Page 40 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 56: ...Page 42 Pilot Valve Tester Operating Manual FIGURE B 2 DAAS SCHEMATIC 1 P N 98933 1 ...
Page 60: ...Page 46 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 61: ...P N 96654 Rev 0 Page 47 APPENDIX C SDS Contact CLIMAX for the latest Safety Data Sheets ...
Page 62: ...Page 48 Pilot Valve Tester Operating Manual This page intentionally left blank ...
Page 63: ......
Page 64: ......