Take-Out (T.O./Arc) –
Used to
enter or solve fitting Take-Outs
when calculating pipe cut lengths.
Calculates inner, center, and outer
arc lengths for marking field cut
fittings.
Offset –
Calculates or enters the
Offset (Rise).
Welder's Gap –
Defines the
Welder's Gap subtracted from the
end-to-end pipe length calculation.
Default value is 1/8", 0 is a valid
value.
Run –
Enters or calculates the Run.
Travel –
Enters or calculates the
Travel (Diagonal).
Pipe Material –
Defines the Pipe
Material. (Steel, Stainless Steel,
Brass, Aluminum, Cast Iron, PVC or
Copper).
Elbow Type
–
Defines the type of
radius (long or short) and whether
a factory or field cut 45˚ Butt Weld
elbow is being used. Default value
is Butt Weld – Long.
Pipe Size
–
Enters the nominal Pipe
Size and provides data pertaining to
the entered size.
P
ocket
R
efeRence
G
uide
—
11
Pipefitting Project Keys
Travel
Slope
Of
fset
Angleº
Angle/Slope –
Enters or calculates
a linear Slope, Slope Angle, or
Percent Grade. The linear slope
is the amount of "Offset" over 12
inches of "Run." Values may be
entered as:
●
a Dimension:
A
●
an Angle or Degrees:
A
●
a Percentage (percent grade):
7
A
Once an angle or slope has been
entered, consecutive presses of
A
will convert to the remaining formats
listed above.
(cont'd)