Securing the machine
It is recommended that the machine is secured to the floor at the four points provided using M10 anchor
screws and the corresponding dowels.
Drill holes, observing
the necessary drill depth
A and drill diameter of
the dowel manufacturer
Clean out the inside of
the holes
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering
2.10
Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
Summary of Contents for 2765
Page 1: ...OPERATING INSTRUCTIONS CAE 2765 2725 Tire Changer...
Page 3: ...3...
Page 17: ...17 1 5 Scale Drawing...
Page 34: ...34...
Page 35: ...35 6 1 Pneumatic circuit diagram 6 0 APPENDIX...
Page 36: ...36 6 2 Electric circuit diagram...
Page 37: ...37 6 3 Hydraulic circuit diagram Not relevant...