![Cadman 3NMB Operator And Maintenance Manual Download Page 13](http://html1.mh-extra.com/html/cadman/3nmb/3nmb_operator-and-maintenance-manual_3258770013.webp)
TR-MAN-3NMB
Operator's Manual - 3NMB
Page 12 of 39
Cadman Power Equipment
▪
BOX 100, Courtland, Ontario, Canada N0J-1E0
▪
Phone: 519-688-2222
▪
Fax: 519-688-2100
▪
www.cadmanpower.com
Step 7
Check that all hose connections are secured correctly. Unfold the boom arms and
move them into position
using your Tractor’s hydraulics
after you have checked all
hose connections.
Figure 12 - Unfold Boom Arms
img-00046-A
Step 8
Pull the hose out to furthest point in your field to prepare for application.
Figure 13 - Boom Field Starting Position
img-00047
The Hose Reel MUST have at least one full coil of hose on the drum as
a minimum to prevent damage to equipment. Damage can cause fluid
leaks and will result in ponding/pooling of effluent.