![Cadman 3NMB Operator And Maintenance Manual Download Page 11](http://html1.mh-extra.com/html/cadman/3nmb/3nmb_operator-and-maintenance-manual_3258770011.webp)
TR-MAN-3NMB
Operator's Manual - 3NMB
Page 10 of 39
Cadman Power Equipment
▪
BOX 100, Courtland, Ontario, Canada N0J-1E0
▪
Phone: 519-688-2222
▪
Fax: 519-688-2100
▪
www.cadmanpower.com
Step 2
Before operating the 3 Nozzle Manure Boom for the first time
OR
after a long period
of storage you must synchronize the splash plate adjustment cylinders. Cycle the
tractor
’
s hydraulic system to close the splash plates. Hold the system in the closed
position for
AT LEAST
5 MINUTES
to purge the boom
’
s hydraulic system of air. This
step must be completed to ensure even coverage during the application process.
Step 3
Raise the 3 Nozzle Manure boom; then raise all four leg stands.
Figure 8 - Retract Stand Legs
img-00696
Step 4
Locate your tractor so that the boom is in front of the nutrient delivery system
connection.
Figure 9 - Locate Tractor
img-00043