
19
Passo
Descrizione
Foto
8
Make the power supply cable
slide into the cable gland until it
arrives at the supply terminal
blocks
Make sure the
input cable is not powered.
Connect the cables to the
terminal blocks and fix them
with the screws. The polarities
of
the
cables
must
be
respected.
In addition to the cable gland,
which must be strictly closed,
the usage of a cable fixing
mechanism
could
be
considered if the weight of the
cable
risk
to
make
it
disconnected.
An example of a 3-phase
installation is in the picture.
9
Insert and close both the
protection and the front covers
again