MONITORING AND TROUBLESHOOTING
3-8
3.2.6 Checking The Entire Network
This section describes areas to check if the problem is not immediately
apparent.
•
Trace the ring path through the network to ensure that there are no
physical layer problems. While tracing the ring:
-
Check the cable connections at MIMs, patch panels and wall
plates, and Token Ring stations.
Are all connectors inserted fully into or secured to ports?
-
Check the installation of the Token Ring network interface cards
in Token Ring stations.
Are the network cards correctly configured and installed?
-
Check the cable conductors for continuity.
Use cable testers designed for this task.
•
Ensure that the maximum cable lengths specified for the media types
used in the installation and also the maximum number of stations
supported are not exceeded.
The cable lengths and station counts for MIMs in the installation are
discussed in their documentation.
When these checks have been successfully completed for each connection
and any other necessary corrections have been made, the network should
perform normally. If network problems persist, contact Cabletron
Systems Global Call Center for assistance (see Preface).
Summary of Contents for TRMM-2
Page 1: ...TRMM 2 TOKEN RING MANAGEMENT MODULE USER S GUIDE ...
Page 2: ......
Page 6: ...TRMM 2 QUICK REFERENCE QR 4 ...
Page 14: ...CONTENTS viii ...
Page 30: ...INTRODUCTION 1 12 ...
Page 78: ...SUPPORTED MIB GROUPS E 4 ...
Page 82: ...INDEX IX 4 ...