CHAPTER 4: CONNECTING TO THE NETWORK
4-10
SEH USER’S GUIDE
2. Attach one end of an AUI cable, no longer than 50 meters in length, to
the port on the EPIM-X (Figure 4-6) and the other end to the intended
node.
Figure 4-6. The EPIM-X
4.2
FINISHING THE INSTALLATION
The SEH is now ready for operation. Before placing the network into
service, test the installation thoroughly, making sure that all stations can
be addressed and that the SEH and all stations are indicating normal
operation. Ensure that the networking software is configured properly to
match the installed network. If errors or abnormal operation are
encountered, proceed to Chapter 5, Troubleshooting.
OFF Position
(Toward Front
of EPIM)
ON Position
(Toward Back
of EPIM)
OFF
ON
1490_18
SEH Book Page 10 Tuesday, March 19, 1996 4:12 PM