Completing the Installation
3-8
Installation
b.
Verify that the RJ21 connector associated with the twisted pair segment has the proper
pinouts and check the cable for continuity.
c.
Check that the twisted pair connection meets the dB loss and cable specifications outlined
in
Chapter 2
.
If a link is not established, contact Cabletron Systems. Refer to
Section 1.2
for details.
6.
Repeat steps 1 through 5 until all connections are made.
3.6
COMPLETING THE INSTALLATION
After installing the SmartSwitch and any optional HSIM, and making the connections to the
network, the SmartSwitch is ready to be configured through Local Management. Refer to
SmartSwitch Series 6H202, 6H203, 6H252, 6H253, 6H258, 6H259, 6H262, 6E233, and 6E253
Local Management User’s Guide for information on how to access and use Local Management.
Refer to
Chapter 4
for information on LEDs and troubleshooting.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for 6E233-49 SmartSwitch 6000
Page 3: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 31: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 57: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...