5–17
Chapter 5: System Setup Screens
5
Test Menu – PLC Enquiry Test
With
PLC Enquiry
Test
highlighted,
press ENT [F5] to
bring up the screen
shown to the right.
If the PLC is
connected to the
panel, press ENT
[F5] to start the test.
Four data tests will
be performed and
indicated as either
Test Passed
or
Test
Failed
as shown on
this page. The BAK
[F1] key can be
pressed to cancel the
test and/or returned
to the previous
screen.
Test Menu – Buzzer Test
With
Buzzer Test
selection highlighted, press ENT [F5] to
run the test on the internal audible beeper. The beeper will
sequence up the scale through eight notes and then start over.
The BAK [F1] key can be pressed to cancel the test.
Note:
The beeper tone is not selectable. The beeper function can not be turned on or off from this screen,
refer to the Setting menu.
Note:
When the panel is powered through Port1 from a connected PLC or PC, the beep will not function
properly because the panel is running in
Low-Power Mode
To use the beep signal, power the panel from an
external 12-24 VDC power source.
BAK
UP
DWN
ENT
ENT
TEST MENU
1 Serial Port1 Loop Back
2 Serial Port2 Loop Back
3 PLC Enquiry Test
4 Buzzer Test
5 Touch Panel Test
BAK
UP
DWN
ENT
ENT
TEST MENU
1 Serial Port1 Loop Back
2 Serial Port2 Loop Back
3 PLC Enquiry Test
4 Buzzer Test
5 Touch Panel Test
BAK
UP
DWN
ENT
ENT
TEST MENU
1 Serial Port1 Loop Back
2
k
3
4
5 Touch Panel Test
Connect Panel to
PLC
BAK
ESC
PLC ENQUIRY TEST
DirectLogic K Sequence
Data1 Test Passed
Data2 Test Passed
Data3 Test Passed
Data4 Test Passed
EA1-MG6-USER-M Hardware User Manual, 1st Ed. Rev C, 09/10
®