OPERATION
RMB 1660 11/10
Operation Section 4-13
© 2010 Alamo Group Inc.
OPERA
T
ION
FRAME ASSEMBLY
•
Ensure all bolts and screws are in position and
are properly torqued.
•
Ensure all pins are in place and fastened with
screws.
•
Ensure frame is properly mounted to tractor and
hardware is properly installed and tightened.
OPS-B- 0021_H
BOOM ARM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly installed.
•
Check condition of teflon bushings at boom pivot
points.
•
Ensure each hydraulic cylinder is installed and retained
correctly. Ensure the proper size pins are used to
retain the cylinders in place and are secured properly.
•
Ensure that all joints are lubricated. See Maintenance
Section for Lubrication Chart.
OPS-B-0022_K
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.
(SG-20)
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings.
IMPORTANT
: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of nylon bushings.
OPS-B- 0023_J
Summary of Contents for RMB 1660
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 34: ......
Page 35: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Page 39: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Page 54: ......
Page 55: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Page 98: ......
Page 99: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Page 108: ...RMB 1660 11 10 P N 50068816C Printed U S A RMB 1660 REAR MOUNT BOOM MOWER...