![Bush Hog HT419H Operator'S Manual Download Page 78](http://html1.mh-extra.com/html/bush-hog/ht419h/ht419h_operators-manual_2834869078.webp)
MAINTENANCE
HT419H 05/22
Maintenance Section 5-4
© 2022 Alamo Group Inc.
MAINTENANCE
NOTE A:
Complete lubrication of Gearbox 1
The complete lubrication of gearbox 1 is done the first time at the manufacturers plant, after which it must be
topped off periodically, as according to the lubrication chart. A complete change or fill is necessary only for the
replacement and /or repairing of the entire gearbox or internal parts. In this case, it is necessary to: remove
caps H-K and inject the grease, using grease pump W, into hole T until the grease comes out of hole K. Then
screw caps H-K back into place on center gearbox 1. Use Multi-Purpose Gear Oil.
Periodic checking and topping up of central Gearbox 1:
Every 100 hours of working time, check and top off central gearbox 1. It is a good practice, however, t check
the condition and quantity of grease after all long periods of inactivity, especially when starting to work again
after the winter break. To top off the grease in central gearbox 1 it is necessary to: remove caps H-K and inject
the proper amount of grease into hole J, using grease pump W. Then screw caps of H back into place on
housing 1.
NOTE B:
Each time the Cardan Driveline is disconnected and whenever the machine is stopped, it is
recommended that power takeoff shaft be cleaned, and replace the protective cover.
NOTE C:
Each time the machine is connected to the tractor.
Driveline Maintenance
Summary of Contents for HT419H
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 19: ...SAFETY HT419H 05 22 Safety Section 1 15 2022 Alamo Group Inc SAFETY Decal Description...
Page 20: ...SAFETY HT419H 05 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY...
Page 21: ...SAFETY HT419H 05 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY...
Page 23: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 28: ......
Page 29: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 48: ......
Page 49: ...Operation Section 4 1 OPERATION SECTION...
Page 74: ......
Page 75: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 82: ...MAINTENANCE HT419H 05 22 Maintenance Section 5 8 2022 Alamo Group Inc MAINTENANCE...
Page 84: ...HT419H SOM 05 22 P N 50076696 Printed U S A HT419H HAY TEDDER...