
MAINTENANCE
HT210
06/17
Maintenance Section 5-2
© 2016 Alamo Group Inc.
MAINTENANCE
Although very little can go wrong with the machine in normal working conditions, a regular inspection of moving
parts is advisable to obtain a full working life.
LUBRICATION
1.
Lubricate the IID shaft after every 5 hours of use.
2.
Lubricate all grease fitting locations on the center section, rotating parts and any other parts after every 10
hours of use.
3.
Check the grease level in the gearbox each working day. Use Multi-Purpose Gear Oil 00786250 when
necessary. Fill to level plug.
4.
After every 10 hours of operation, check all bolts, nuts, and tines. Tighten as needed.
The Center Main Gearbox should be lubricated after 50 working hours. Use Multi-Purpose
Gear Oil P/N 00786250.
How to Lubricate (Mnt-HT-0001):
1.
Remove plugs (1 & 2).
2.
Inject grease into hole (A) by using nipple (3)
fitted to a pump, until grease comes out of
upper hole (B).
3.
A complete lubrication requires 2 lbs. of grease.
4.
After lubrication you should retighten plugs (1 &
2).
ROTOR PHASING
Whenever maintenance is required on the
gearboxes, the rotor phasing must be checked
before operation to keep the arms from interfering
in operation. The correct rotor phasing is shown
below (Mnt-HT-0002).t.
Summary of Contents for HT210
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 19: ......
Page 20: ......
Page 21: ......
Page 23: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 25: ......
Page 27: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 33: ...Operation Section 4 1 OPERATION SECTION...
Page 56: ......
Page 57: ...Maintenance Section 5 1 2016 Alamo Group Inc MAINTENANCE SECTION...
Page 60: ...MAINTENANCE HT210 06 17 Maintenance Section 5 4 2016 Alamo Group Inc MAINTENANCE...
Page 62: ...HT210 SOM 06 17 P N 50068746 Printed U S A HT210 HAY TEDDER...