OPERATION
HT210
06/17
Operation Section 4-4
OPERA
T
ION
© 2016 Alamo Group Inc.
The tractor used to operate the tedder must have the power capacity to lift, pull, and operate the Power Take
Off (PTO) at the tedder’s rated speed while traveling at a ground speed between 2 and 5 MPH. Operating the
tedder with a tractor that does not meet the following requirements may cause tractor or tedder damage and be
a potential danger to the operator and passersby.
Tractor Requirements and Capabilities
Tractor Requirements and Capabilities
•
ASABE approved Roll-Over Protective Structure (ROPS) or ROPS cab and seat belt.
•
Tractor Safety Devices .................... Slow Moving Vehicle (SMV) emblem, lighting, PTO master shield
•
Tractor Horsepower ......................... 15 HP Minimum
2.2 Tractor Horsepower
The power required to operate a implement is determined by the tractor PTO horsepower. For most operating
conditions, the HT210 requires a tractor with at least 15hp. Operating the implement with a tractor that does
not have adequate power may damage the tractor engine. Exceeding the recommended horsepower may
cause damage by overpowering the unit in heavy operating conditions.
2.1 ROPS and Seat Belt
The tractor must be equipped with a Roll-Over-Protective-Structure (ROPS) (tractor cab or roll-bar) and seat
belt to protect the operator from falling off the tractor, especially during a roll over where the driver could be
crushed and killed. Only operate the tractor with the ROPS in the raised position and seat belt fastened.
Tractor models not equipped with a ROPS and seat belt should have these life saving features installed by an
authorized dealer.
OPS-U- 0003
Operate this Equipment only with a Tractor equipped with an approved roll-
over-protective system (ROPS). Always wear seat belts. Serious injury or
even death could result from falling off the tractor--particularly during a turnover
when the operator could be pinned under the ROPS.
(SG-7)
Summary of Contents for HT210
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 19: ......
Page 20: ......
Page 21: ......
Page 23: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 25: ......
Page 27: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 33: ...Operation Section 4 1 OPERATION SECTION...
Page 56: ......
Page 57: ...Maintenance Section 5 1 2016 Alamo Group Inc MAINTENANCE SECTION...
Page 60: ...MAINTENANCE HT210 06 17 Maintenance Section 5 4 2016 Alamo Group Inc MAINTENANCE...
Page 62: ...HT210 SOM 06 17 P N 50068746 Printed U S A HT210 HAY TEDDER...