OPERATION
2387 01/11
Operation Section 4-42
© 2011 Alamo Group Inc.
OPERA
T
ION
10.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Summary of Contents for 2387
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 30: ......
Page 31: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 36: ......
Page 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 100: ...MAINTENANCE 2387 01 11 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Page 101: ...MAINTENANCE 2387 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 104: ...2387 SOM 01 11 P N 50069202 Printed U S A 2387 LOADER...