OPERATION
2387 01/11
Operation Section 4-25
© 2011 Alamo Group Inc.
OPERA
T
ION
Lift and roll back of bucket will increase efficiency
because...
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE: Do not be concerned if the bucket is not completely filled during each pass. Maximum productivity is
determined by the amount of material loaded in a given period of time. Time is lost if two or more attempts are
made to fill the bucket on each pass.
Summary of Contents for 2387
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 30: ......
Page 31: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 36: ......
Page 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 100: ...MAINTENANCE 2387 01 11 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Page 101: ...MAINTENANCE 2387 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 104: ...2387 SOM 01 11 P N 50069202 Printed U S A 2387 LOADER...