7 | Commissioning
16 | 36
Instruction Manual R5 RU 0050-0070 B_EN_en
7
Commissioning
NOTICE
The machine can be shipped without oil.
Operation without oil will ruin the machine in short time!
●
Prior to commissioning, the machine must be filled with oil, see
CAUTION
During operation the surface of the machine may reach temperatures of more than 70°C.
Risk of burns!
●
Avoid contact with the machine during and directly after operation.
●
Make sure that the installation conditions (see
●
Switch on the machine.
NOTICE
Frequent starts and stops by connecting and disconnecting from the power supply.
Risk of damage to the machine!
Starting the machine by connecting and disconnecting the power supply is permitted max. 1x per
minute. Between disconnecting and connecting at least 10 seconds must have been passed. If the
process requires more frequent starts/stops of the machine:
●
Use the digital start signal.
●
Maximum permissible number of starts by using the digital signal: unlimited
As soon as the machine is operated under normal operating conditions:
●
Measure the mains current or read it via PC-Software or controller.
7.1
Continuous Operation
NOTICE
Working at a suction pressure higher than 20 hPa in continuous operation.
Oil will gush out from the exhaust and the machine will run out of oil very quickly!
Operation without oil will ruin the machine in short time!
●
Limit the suction pressure in continuous operation.
The operating time in continuous operation is not limited below a suction pressure of 20 hPa abs.
(mbar).