Maintenance | 8
Instruction Manual COBRA BA 0100 C_EN_en
23 | 36
CAUTION
Failing to properly maintain the machine.
Risk of injuries!
Risk of premature failure and loss of efficiency!
●
Maintenance work must only be executed by qualified personnel.
●
Respect the maintenance intervals or ask your Busch representative for service.
NOTICE
Using inappropriate cleaners.
Risk of removing safety stickers and protective paint!
●
Do not use incompatible solvents to clean the machine.
●
Shut down the machine and lock against inadvertent start up.
If the machine is equipped with a barrier gas system:
●
Close the barrier gas supply.
●
Vent the connected lines to atmospheric pressure.
If necessary:
●
Disconnect all connections.
8.1
Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals
given below are considered as starting values which should be shortened or extended as appropri-
ate. Particularly harsh applications or heavy duty operation, such as high dust loads in the environ-
ment or in the process gas, other contamination or ingress of process material, can make it neces-
sary to shorten the maintenance intervals significantly.
Interval
Maintenance work
Yearly
●
Check the oil level, see Oil Level Inspection [
●
Check the oil color, see Oil Color Inspection [
24].
●
Carry out a visual inspection and clean the machine from
dust and dirt
●
Check the electrical connections and the monitoring devic-
es.
Every 16000 hours, could be
shortened or extended depend-
ing on the application
●
Change the oil of the gear and bearings, see Oil Change
[
●
If necessary, have a major overhaul on the machine (con-
tact Busch).
8.2
Oil Level Inspection
●
Shut down the machine.
●
When the machine is stopped, wait 1 minute before checking the oil level.