
7
Assembly Instructions - Table Top
Step 6:
Align Right Side Hearth to the outline created. The
overall width should allow for an approximate gap of 1/8”
between slabs for the additional mortar to unite the
remaining slab. Check for surface flatness, level if
necessary. Then lay the Left Side Hearth. This will become
your base plate. (Figure 4)
Step 7:
Set the Front and Rear Dome in place. Use the damp
sponge to wet the surfaces where mortar will be applied.
Check that all is level. If you need to make adjustments,
use shims. Place one or more of these shims between the
lowest wall component and the top surface of the base
plate. Once you are satisfied with the degree of levelness,
you can address any gap that may have occurred with an
appropriate amount of mortar. (Figure 5)
Note:
Although you are cautioned to use
Burntech
mortar
sparingly because it does have such holding power, you
should look over the oven assembly at the end and fill in
any gaps, especially joint connections, with the mortar.
Important:
Adjustments can ONLY be made while the
mortar is still wet when correcting for square-ness and
leveling.
Step 8:
Assemble one Dome Side. The beveled face lines up
with the inward angles of the Front and Rear Dome sides.
Top surfaces should be level. (Figure 6)
Step 9:
The firebricks for the oven cooking surface are
precut. Place firebrick tightly together using the
appropriate layout shown. Do not mortar firebrick to floor
of oven or to each other. Place a small amount of mortar
under outside bricks to hold in place. (Figure 7 & 8)
Figure 6
Figure 4
Figure 5
Figure 7
Figure 8
Summary of Contents for Wood Fired Outdoor Oven
Page 4: ...4 Component List ...
Page 5: ...5 Wood Storage Optional Table Top Masonry Chimney Optional ...
Page 10: ...10 ...