15
Figure 11: Recommended Horizontal Vent Installation
a. Recommended Installation: slope toward vent
terminal. See Figure 11.
b. Alternate Installation (where recommended
installation is not practical): slope toward boiler.
Horizontal vent drain tee (see Table 7 for part
number) required. See Figure 12.
N
O
I
T
U
A
C
s
e
c
a
f
r
u
s
n
o
m
r
o
f
y
a
m
e
c
i
d
n
a
e
r
u
t
s
i
o
M
t
n
e
v
e
r
p
o
T
.
l
a
n
i
m
r
e
t
t
n
e
v
d
n
u
o
r
a
d
o
o
g
n
i
e
b
d
l
u
o
h
s
s
e
c
a
f
r
u
s
,
n
o
i
t
a
r
o
i
r
e
t
e
d
)
.
c
t
e
d
e
t
n
i
a
p
,
d
e
l
a
e
s
(
r
i
a
p
e
r
2. Vent terminal location restricted per following:
a. Minimum 12 inches above grade or normally
expected snow accumulation level, or 7 feet
above grade if located adjacent to public
walkway. Do not install over public walkways or
areas where local experience indicates
condensate or vapor from Category III
appliances creates a nuisance or hazard .
b. Minimum 3 feet above any forced air inlet
located within 10 feet.
c. Minimum 1 foot below, 1 foot horizontally from,
or 1 foot above any door, openable window,
gravity air inlet, or building opening through
which fl ue gases could enter any building
(including adjacent buildings).
Figure 12: Alternate Horizontal Vent Installaltion