
111
107672-03 - 5/18
XII. Operation
E. Boiler Sequence Of Operation (continued)
3. Status Screens
Boiler Status screens are the primary boiler monitoring screens. The user may simply “walk” though
boiler operation by repeatedly selecting the right or left “arrow” symbol. These screens are accessed by
selected the “Status” button from the “Home” screen.
Figure 12.7: Boiler Status Screen Definitions
Figure 12.6: Status Screens
Summary of Contents for K2WT Residential
Page 88: ...88 107672 03 5 18 X Wiring continued Figure 10 7 Internal Ladder Diagram ...
Page 89: ...89 107672 03 5 18 PAGE LEFT INTENTIONALLY BLANK ...
Page 90: ...90 107672 03 5 18 X Wiring continued ...
Page 91: ...91 107672 03 5 18 Figure 10 8 Internal Wiring Connections Diagram X Wiring continued ...
Page 103: ...103 107672 03 5 18 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Page 148: ...148 107672 03 5 18 XV Service Parts continued ...
Page 152: ...152 107672 03 5 18 XV Service Parts continued ...
Page 154: ...154 107672 03 5 18 XV Service Parts continued 85 86 91 95 ...
Page 163: ...163 107672 03 5 18 ...
Page 164: ...164 107672 03 5 18 ...
Page 165: ...165 107672 03 5 18 ...
Page 166: ...166 107672 03 5 18 ...
Page 167: ...167 107672 03 5 18 ...