![Burnham 5006B Installation And Operation Manual Download Page 3](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904003.webp)
3
BOILER SIZE
5006B 5007B 5008B 5009B 5010B 5011B 5012B 5013B 5014B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
CARTONS, PACKAGES OR BUNDLES
7 S
Steam Trim Carton (Steam Boilers Only - Includes PA404 Pressure Limit Control) 4 Sizes - One Per Boiler
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
2
---
---
---
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
3
---
---
---
---
---
---
1
1
1
1
1
1
1
1
1
---
---
---
---
4
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
1
1
1
1
67 Bc-2
Low Water Cut-off Carton (Steam Boilers Only) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7 W
Water Trim Carton (Water Boilers Only - Includes L4006A Temp. Limit Control) 3 Sizes - One Per Boiler
2
1
1
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
3
---
---
---
---
---
--
1
1
1
1
1
1
1
1
1
1
1
---
---
4
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
1
1
64
Low Water Cut-off Carton (Water Boilers Only) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
U
8
Complete Jacket Carton Assembly - One Per Boiler
9
Gas Train Cartons (By Gas) 2 Sizes - One or Two Per Boiler
9
1
1*
1*
1*
---
---
---
---
---
---
2
1
---
---
---
---
---
---
---
---
9
2
---
---
---
1*
1
1
1
1
1
---
1
2
2
2
2
2
2
2
2
9
3
ei
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
ei
Controls Carton(s) (By Gas) (Intermittent Elec. Ign. - 100% Shutoff - 24V.) 1 Size - One or Two Per Boiler
EI
1
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
EI
2
---
---
---
---
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
U
HcP
1
Plain Heater Cover Plate (Not furnished on Water Boiler Ordered With Two Tankless Heaters) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
U
HcP
2
Tapped (¾” NPT) Heater Cover Plate (Not Furnished on Water Boiler Ordered With Tankless Heater(s) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
U.S.A. EQUIPMENT CHECK LIST
INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed.
Our responsibility ceases upon delivery of Boiler to carrier in good condition. Any claims for damage or shortage in
shipment must be filed immediately against the carrier by the consignee. No claims for variances or shortages will be
allowed by Boiler Manufacturer, unless presented within sixty (60) days after receipt of equipment.
*Carton 9
1
, or 9
2
on sizes 5006B thru 5009B is standard on all systems except EI and may be optional on 5006B thru
5009B EI.
Carton 9
3
is standard on sizes 5006B thru 5009B for EI systems.
This Series 5B Boiler has been approved by the Massachusetts Board of Plumbers and Gas Fitters:
Approval No. G1-0202-11A.
The Commonwealth of Massachusetts requires this product to be installed by a licensed Plumber or Gas Fitter.
IMPORTANT INFORMATION
SERVICE ON THIS BOILER SHOULD BE UNDERTAKEN ONLY BY TRAINED AND SKILLED PERSONNEL.
KEEP BOILER AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE AND OTHER
FLAMMABLE VAPORS AND LIQUIDS.
DO NOT PLACE ANY OBSTRUCTION IN THE BOILER ROOM THAT WILL HINDER THE FLOW OF
COMBUSTION AND VENTILATING AIR.
READ THESE INSTRUCTIONS CAREFULLY BEFORE PROCEEDING WITH THE INSTALLATION OF
BOILER. POST INSTRUCTIONS NEAR BOILER FOR REFERENCE BY OWNER AND SERVICEMAN.
MAINTAIN INSTRUCTIONS IN LEGIBLE CONDITION
.
SecTiON i – eQUiPMeNT cHecK LiST (continued)
Summary of Contents for 5006B
Page 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Page 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Page 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Page 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Page 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Page 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Page 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Page 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Page 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Page 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Page 112: ...112...