
17) Using .025" wire, make the connecting rods for the brake gear. Glue in place with CA.
If you choose to model the airlines between the cylinder, ABD valve, and reservoir, do it at this time.
Drill out the holes for the towing staples with a 1/16" bit. Secure the towing staple with CA. There are a total of four (4). Also drill out the
holes for the stirrup steps with a 1/16" bit, and secure them with CA.
Glue the trainline to the end of the car (you may have to trim it to length).
DEFECT CARD >
TOWING STAPLE >
TRAINLINE >
< ABD valve
< CYLINDER
< RESERVOIR