7

Type BBS-25:

 

Insert clamp seal into the threaded connection before screwing the 

connection element together. 

   

EPDM seals:

 

Do not install using grease or oil!

 

    If required, glycerin can be used as an installation aid.
Clamp seal must be located centrically and firmly and tightly in the 

designated groove and must not protrude into the pipe connection.

6.3.  Installing the pipe connection

 

Ensure that the seal is located correctly in the sealing contour.

 

Assemble both connection parts so that they are in alignment  

(concentric deviation and angular offset of the pipe ends  

max. +/–0.5 % of the outer pipe diameter)

Type BBS-03

 

Pull union nut over the liner.

 

We recommend lubricating the thread with suitable grease.

 

Manually turn union nut clockwise on the threaded connection. 

Ensure that the connection turns freely, do not use force.

 

Tighten union nut using a suitable tool, 

observe tightening torque

 

(see "Tab. 2").

Orifice (DN)

08

10

15

20

25

32

40

50

Tightening 

torque (Nm)

149 280 380 665 890 1380 2620 2900

Tab. 2:  Tightening torque Type BBS-03

We recommend using flanges from DN 40.

Type BBS-06

 

Insert hexagon bolts through the screw holes in the flange.

 

Push circlip over the ends of the bolts.

 

Turn nuts on to the bolt threads, tighten by hand.

 

Tighten bolts crosswise using a suitable tool until flange sheets are 

firmly situated one on top of the other. 

Observe tightening torque

 

(see "Tab. 3").

Bolt size

M08

M10

M12

M16

Tightening torque (Nm)

19

21

36

88

Tab. 3:  Tightening torque Type BBS-06

english

8

Type BBS-05 and BBS-25

NOTE! 

Damage to the connection element!

•  Do not use any tools to install the clamp.

 

Manually place clamp over the connection.

 

Insert clamp screw into the designated slot, but do not use force.

 

Check that the clamp is seated correctly.

 

Carefully and evenly tighten the wing nut by hand until both pipe 

components are firmly situated one on top of the other.

7.  START-UP

WARNING!

Risk of injury from improper operation!

Improper operation may result in injuries as well as damage to the 

connection element and the surrounding area. 
•  Before start-up, ensure that the operating personnel are familiar 

with and completely understand the contents of the operating 

instructions.

•  Observe the safety instructions and intended use.

•  Only adequately trained personnel may start up the equipment/the 

connection element.

•  Following assembly, ensure a controlled restart.

•  When starting up the equipment, ensure that no unauthorized volt-

age increases and pressure surges can occur.

english

9

NOTE! 

Damage to the seals when cleaning the pipeline systems.

•  Clean the pipeline systems preferably with a cleaning agent which 

does not damage the seals.

•  Do not clean the connection elements with wire brushes or 

machines which cause abrasion of the surface.

•  When using mechanical pipeline monitoring devices, ensure 

that they do not damage the sealing elements (also the sealing 

contour).

Damaged seals must be replaced!

8.  MAINTENANCE

WARNING!

Danger – high pressure and discharge of medium! 

•  Before loosening the lock nut or locking clamp, always turn off the 

pressure and vent the lines. 

•  Wear protective equipment if media is hazardous.

•  Lock nuts or locking clamps of the connection elements on pres-

surized lines may be retightened only by technicians in consider-

ation of special precautions.

•  When shutting down the equipment, ensure that no unauthorized 

voltage increases and pressure surges can occur. 

•  Following maintenance, ensure a controlled restart.

Have the connection elements serviced regularly by technicians! 

We recommend a maintenance interval of 6 months.
Inspection and maintenance work includes in particular monitoring and 

ensuring the
• leak-tightness,

• identification,

• proper mode of operation of the safety and warning devices.

english

Summary of Contents for BBS-03

Page 1: ...25 english 3 4 GENERAL INFORMATION 4 1 Contact address Germany B rkert Fluid Control Systems Sales Center Christian B rkert Str 13 17 D 74653 Ingelfingen Germany Tel 49 0 7940 10 91 111 Fax 49 0 7940...

Page 2: ...NG Risk of injury from improper assembly Installation must only be carried out by authorized technicians and with the appropriate tools Secure system from unintentional activation 6 1 Welding in the p...

Page 3: ...tighten the wing nut by hand until both pipe components are firmly situated one on top of the other 7 START UP WARNING Risk of injury from improper operation Improper operation may result in injuries...

Page 4: ...nglish 12 1 DIE BEDIENUNGSANLEITUNG Die Bedienungsanleitung enth lt wichtige Informationen Anleitung sorgf ltig lesen und besonders die Hinweise zur Sicherheit beachten Anleitung so aufbewahren dass s...

Page 5: ...sind der Pr gung auf dem Verbindungselement zu entnehmen Die Identnummer des Verbindungs elements entnehmen Sie bitte dem mitgelieferten 3 1 Zeugnis Material Rohrma Chargennummer Norm Bild 1 Beispiel...

Page 6: ...arf nicht in die Rohrverbindung ragen 6 3 Montage der Rohrverbindung Sicherstellen dass die Dichtung richtig in der Dichtkontur liegt beide Verbindungsteile zusammenf gen so dass sie fluchtend auf ein...

Page 7: ...nzeichnung ordnungsgem en Funktionsweise der Sicherheits und Warneinrichtungen deutsch 20 ffnen der Verschraubung Typ BBS 03 und BBS 06 Sicherheitshinweise beachten Verschlussmutter bzw Verschlussschr...

Page 8: ...concernant les types BBS 03 BBS 05 BBS 06 et BBS 25 sur Internet sous www burkert fr 3 CONSIGNES DE S CURIT FONDAMENTALES Ces consignes de s curit ne tiennent pas compte des hasards et des v nements p...

Page 9: ...le contour d tanch it Nous recommandons d tablir un rapport de soudage 6 2 Montage du joint REMARQUE Endommagement du joint EPDM et du joint FEP Les contours d tanch it et les surfaces de contact doi...

Page 10: ...sous pression en respectant les mesures de s curit sp cifiques Mettre l installation hors service en veillant emp cher les aug mentations de tension et les coups de b lier inadmissibles Garantir un re...

Page 11: ...tructions de service et fiches techniques sur Internet www buerkert fr 2013 B rkert Werke GmbH Operating Instructions 1304 00_EU ML_00810203 Original DE B rkert Fluid Control Systems Sales Center Chri...

Reviews: