Copyright 2020 Burger King Corporation. All Rights Reserved.
Required Deliverables: In the event of an audit
Picture List: All Front Counter & Drive Thru photos should be repeated for each terminal. For a
second FC terminal, you will number 2.1, 2.2, 2.3, etc.
Suggested photos:
Front Counter Before & Drive Thru Before
FC
–
Wide shot overview; Crew Perspective
FC
–
Wide shot overview; Customer Perspective
FC
–
Cabling (with visibility of Green Sticker on power cord)
DT
–
Wide Shot of Drive-Thru; Crew Perspective
DT
–
Cabling (with visibility of Green Sticker on power cord)
Transaction Approval Screen from each Terminal (i.e. DT-1, FC-Manager, FC-2, etc.)
Gift Card Approval from each Terminal (Include successful GC Redeem)
Suggested times for installation are:
3am
–
6am
9:00am
–
10:30am
1:30pm
–
5pm
7pm-10pm
Note: Guiding principle is to stay away from your peak times