9
PRODUCT and RECIPE SETUP - continued
5. Select the Products tab from the "Recipes"
screen.
6. Choose first product to load in the grinder.
The grinders must be primed for initial set up.
If changing beans, the grind chamber must be
cleared and primed with the new beans. Refer
to page 6.
54377.7000 120117
7. Now select the "Grinder Calibration" button
tab from the "Editing Product" screen.
8. From the "Editing Product - Product Grinder
Calibration" screen, the user can load the grind-
er with the chosen product.
Note: The Bean Hopper selector automatically
defaults to the Left hopper. Use the drop-down
to select the correct hopper.
Remove the brew funnel and place a cup or
container below the grinder chute capable of
holding twelve ounces (12 oz.). Refer to Instal-
lation and Operating Guide, Care and Cleaning.
Press "Start". After the timer has stopped, the
grinder is primed.
9. Discard the product cleared from the grinder; the grinder is now ready for calibration.
Summary of Contents for Sure Immersion 220
Page 6: ...6 PROGRAMMING FLOWCHART continued 54377 7000 091517...
Page 7: ...7 PROGRAMMING FLOWCHART continued 54377 7000 120117...
Page 15: ...15 PRODUCT and RECIPE SETUP continued 54377 7000 072217...
Page 94: ...15 CONFIGURATION DE PRODUIT ET DE RECETTE suite 54377 7000 072217...
Page 102: ...7 ORGANIGRAMME de PROGRAMMATION suite 54377 7000 120117...
Page 103: ...6 ORGANIGRAMME de PROGRAMMATION suite 54377 7000 091517...