background image

4

USER NOTICES

This server allows portable storage and dispensing of up to 1½ gallons of hot beverage at remote locations. 
Coffee can be brewed directly into the server without removing the cover when used with a BUNN

®

 INFUSION 

SH brewers. The spill-resistant design lessens the chance of hot beverage burns and splashes.

USING THE SERVER

NOTE

:  Bunn-O-Matic recommends the three step method for cleaning and sanitizing the server. The 3 

step method consists of hot soapy water using an mild, non-citrus detergent, a fresh water rinse and an 
aqueous sanitizing solution using a non-chlorine sanitizer. Do not submerge the server. Failure to follow 
the recommended cleaning procedures can cause corrosion to the stainless steel surface. 

USE OF ANY 

CHLORINATED PRODUCT VOIDS THE FACTORY WARRANTY.

1.  Rotate the lifting handle back completely to release the lid.

2.  Grasp the lid using the two finger holds (as shown), then 

lift the lid straight up to remove.

3.  Fill server with non-chlorine cleaning solution, and 

thoroughly clean inside of server using a SOFT, 
Non-abrasive cloth or brush. Drain and thoroughly 
rinse using fresh water.

4.  Fill the server with non-chlorine sanitizing solution, and 

let server sit for no more than five (5) minutes, then drain 
through fully open faucet.

WARNING

DO NOT USE ON OPEN FLAME OR ELECTRIC ELEMENTS.

DO NOT CLEAN WITH BLEACH.
DO NOT IMMERSE SERVER.

H OT   L I Q U I D



FAILURE TO COMPLY RISKS PERSONAL INJURY

OR EQUIPMENT DAMAGE.

26186.0000

1

continued >

INTRODUCTION

The notices on this server should be kept in good condition.  
Replace unreadable or damaged labels.

Simply select the desired brew batch size on the brewer 
and place the server beneath the funnel dripout. Press and 
release the start switch to initiate a brew cycle. Fresh HOT 
coffee is immediately available at the faucet.

NOTE

: Be careful not to overfill the server.

The server features liquid level monitoring, temperature 
monitoring, and a freshness timer. Holding temperature and 
freshness time are factory set, but can be adjusted by 
changing the programmed recipe.

The server has two LED status indicator lights. (Some servers 
have a blue LED only and some have a multi-colored LED)

CLEANING

• 

LED Off

: Server is not powered.

• 

LED On

 (Blue): Server is powered and 

all  is  Normal      .                .                                                                                                          

• 

Fast Flash

 (Blue): Brew is underway.

• 

Slow Flash

 (Blue/Red): Server needs 

attention – Freshness Timer is Expired 
and/or Server is Empty.

• 

Slow Flash

 (Yellow, RGB Server only): 

Server needs attention – Freshness 
Timer is within 7 minutes of Expiration.

• 

Double Flash

 (Blue/Red): Server needs 

attention – Auto-Off Timer has expired.

• 

Fast Blip Off

 (Blue/Red): Server needs 

attention – Temperature Sensor Fault.

2

081221

Summary of Contents for Soft Heat Infusion Series

Page 1: ...ne 217 529 6601 Fax 217 529 6644 INSTALLATION OPERATING GUIDE For Technical Service contact Bunn O Matic Corporation at 1 800 286 6070 53431 0001 H 9 21 2017 Bunn O Matic Corporation www bunn com Soft...

Page 2: ...o not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN at its exclusive op tion while the equipmen...

Page 3: ...cleaning This appliance is intended for commercial use in applications such as staff kitchen areas in shops offices and other working environments by clients in hotel and motel lobbies and other simil...

Page 4: ...ive 5 minutes then drain through fully open faucet WARNING DO NOT USE ON OPEN FLAME OR ELECTRIC ELEMENTS DO NOT CLEAN WITH BLEACH DO NOT IMMERSE SERVER HOT LIQUID FAILURE TO COMPLY RISKS PERSONAL INJU...

Page 5: ...sanitizer solution 75 F warm water and approved sanitizer 9 Turn the faucet wingnut in a counter clockwise direction and remove the faucet from the dispenser Unscrew the faucet cap from the faucet bod...

Page 6: ...ve 5 minutes 12 13 Remove the faucet parts from the sanitizer solution and allow to air dry overnight 13 15 14 18 Re attach faucet to server shank by turning clockwise direction When reassembling USE...

Page 7: ...E BLACK WHITE WHITE WHITE RED RED 72W 24VDC 24VDC BLUE LEDs CIRCUIT BOARD LIQUID PROBE TANK TEMP SENSOR HEATER GREEN BLACK BLACK ORANGE BLACK WHITE WHITE RED 72W 24VDC 24VDC 24VOLTS DC RGB LEDs BLUE G...

Page 8: ...8...

Reviews: