10
Maintenance
10.1
Cleaning
10.1.1
Cleaning schedule
Interval
Machine part
Dura-
tion
Measure
3000 h /
6 months
Machine outside.
__:__
►
Remove dust and dirt deposits.
Electric cable
__:__
►
Clean with a damp cloth.
10.2
Lubrication
10.2.1
Lubrication schedule
The bearing is maintenance-free.
Interval
Machine part
Dura-
tion
Measure
Gearmotor
__:__
►
Adhere to the documentation supplied by the
manufacturer.
22
Bühler AG
MAYV-20150-2-1808-en-US
Chapter 10
Maintenance